客(ke)戶服務
| 地(dì)址: | 河北省(sheng)泊頭市道(dào)一见❌倾心漫画🌈東街88号 |
| 電(diàn)話: | 0317-8185077 |
| 0317-8263980 | |
| 0317-8223128 | |
| 傳真: | 0317-8265584 |
| E-mail: | [email protected] |
| 螺杆(gǎn)泵的裝配(pei)流程 Screw pump assembly process |
①螺杆(gǎn)泵裝配前(qián)用煤油或(huo)者汽油清(qīng)洗全部零(líng)件,去掉氧(yǎng)化皮和型(xíng)砂。(1) with kerosene or gasoline cleaning all parts before assembly, remove scale and sand. ②将軸承(cheng)裝在主動(dong)螺杆上,并(bìng)用圓螺母(mǔ)鎖緊。(2) the bearing is installed on the active screw, with a round nut lock. ③将卸(xiè)壓套裝在(zài)軸承體内(nèi),再穿入主(zhu)動螺杆。 ![]() (3) the unloading suits in the bearing, and then through the active screw. ④将(jiang)泵套裝入(rù)泵體中。(4) the pump set into the pump body. ⑤将(jiang)軸承體、卸(xie)壓套、主動(dong)、從動螺杆(gǎn)一起裝入(ru)泵套與🍓泵(bèng)體中。 (5) the bearing body, unloading, driving and driven screw together into the pump set and pump body. ⑥将主(zhu)動襯套、從(cóng)杆襯套、止(zhi)推墊裝入(rù)泵套與主(zhu)、從螺🔞杆📧上(shàng)。 ⑦将後蓋裝(zhuāng)入泵體上(shàng)。All landowners will back cover load on the pump body. ⑧從主杆螺(luo)杆伸出端(duan)依次裝入(ru)機械密封(feng)、密封壓蓋(gài)。Was out from the main pole screw end into the mechanical seal, seal gland in turn. ⑨将安全閥(fa)組裝在泵(beng)體上部。The relief valve assembly pet-name ruby to the pump body upper part. 安(an)全閥的裝(zhuāng)配:The relief valve assembly: ①将閥座(zuo)裝入泵體(tǐ)内,并用螺(luo)釘固定。(1) the seat into the pump body and screw fixation. ②将(jiāng)調節杆旋(xuan)入閥後蓋(gai)。(2) to regulate stem screwing in the back cover. ③依次講閥(fá)瓣、彈簧、彈(dàn)簧座裝入(ru)閥體,再将(jiang)閥後蓋與(yǔ)閥體連接(jiē)🧑🏽🤝🧑🏻好,裝螺母(mu)防護帽。(3) speak in turn into the valve body, disc, spring, spring seat and the back cover and body connection is good, protective cap nut. |
版(ban)權所有:芜湖韦纳计算机设备集团(WAP站) 電(diàn)話:0317-8183535
傳真:0317-8265584 E-mail:[email protected]備(bei)案号:冀ICP05010751号(hào)-3
傳真:0317-8265584 E-mail:[email protected]備(bei)案号:冀ICP05010751号(hào)-3

